Indoor Work
Track Units
Require 14’ of overhead clearance for probing/drilling
Approximately 6’ wide and 11’ long
Ventilation System when needed for venting exhaust from the probe outside the building
Generator and Lights when needed for buildings with no power source
Installing a 3” Recovery Well with 6.25” Augers in a 6’ wide aisle.
Using high temp exhaust hose and high CFM blower, OES is able to vent exhaust from the interior of a building.
540-MT Hand Cart - for smaller spaces with limited access and clearance
Separate engine that can be up to 125’ away from the probe
Requires 8’ 4” overhead clearance
Weight ~1,000 lbs.
Requires 36” wide entrance
Lifting the 540-MT Hand Cart into the loading dock for indoor work.